Datacenter migration and backup. Moved, checked, switched on.
Physical datacenter migration in Frankfurt: between halls, between datacenters, or out for good. We confirm with your team that backups have run before anything is switched off, and decommission what stays behind.
Request a quoteWhat we do. The physical side of the move.
Plan the move
We walk the racks with your inventory and agree the order, the labels and the shutdown windows with you.
Backups confirmed first
Before a server is powered down, we confirm with your team that its backup has run.
De-rack and re-rack
Servers, storage and switches come out of the old racks and go into the new ones, in the same datacenter or another, labelled as agreed.
Cabling and power-up
Recabled to your plan and powered up, then checked with your team before we leave.
Datacenter decommissioning
Hardware that isn’t moving is taken out of the racks, and its drives can go to our data destruction service.
How a move runs. In four steps.
Inventory and plan
You send the inventory and the target racks; we agree the order and the windows.
Backups confirmed
Your team confirms each backup before its server is switched off.
Move and rack
We de-rack, move and rack the hardware again, labelled as agreed.
Power up and hand over
Cabled, powered up and checked with your team, then handed back.
Questions, answered.
Other services
GPU smart hands
Hands-on work on GPU servers: part swaps, rack and stack, and the checks after each job.
About GPU smart handsSSD/HDD destruction and ITAD
Certified erasure or destruction of drives, with a certificate of destruction for your records.
About destruction and ITADRemote and smart hands
A technician in your Frankfurt datacenter: reboots, swaps, cabling and checks.
About remote and smart hands
Planning a move? Tell us about it.
Send us the sites, the hardware and the timeline, and we’ll come back with a quote.
Request a quote